翻訳と辞書 |
Elgea-Urkilla eolic park : ウィキペディア英語版 | Elgea-Urkilla eolic park Elgea-Urkilla eolic park is a wind farm in Spain which was authorized to be built on 23 August 1999 by the union of Iberdrola Ente Vasco and Sociedad de Eolicas de Euskadi, S.A. Its construction took 6 months and it is situated between Alava and Gipuzkoa, powering villages such as Barrundia, San Millan, Eskoriatza and Aretxabaleta. The park also reaches the limits of the Aizkorri-Aratz natural park. It fills , with 40 towers, twenty-seven of which are in Alava. The park's construction created a wide protest because of the site's impact.〔(«El parque eólico de Elguea obtiene la autorización para instalarse» ), ''El País'', 1999-03-24.〕 ==Amount of energy==
The Elgea-Urkilla eolic park will generate 66 million kW, sufficient for 100,000 people. The 40 aerogenerators of 600 kW will generate electricity at a 690 V tension, elevated to 20 kV because of the transformer 0.69/20 kV inside the central tower of each generator. The mills are interconnected creating three half tensioned groups from which underground connections connect the generator and the transformer´s substation. The substation, which is situated at from the 40th generator, elevates the tension to 220 kV. Finally the energy is sent to the Vitoria-Itxaso line, property of Iberdrola, and providing power to Alava and some villages of Gipuzcoa. This park will reduce the carbon dioxide emissions by 60,000 tonnes along with 240,000 tonnes of sulphur dioxide.
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Elgea-Urkilla eolic park」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|